Website logo
Website logo
EPMM High Availability Guide
Revision history
High availability overview
High Availability Scenarios
Two Ivanti EPMM servers across two data centers
Three Ivanti EPMM servers across two data centers
Two Ivanti EPMM servers and two Ivanti Sentry servers on one data center
Three Ivanti EPMM servers and two Ivanti Sentry servers on two data centers
Load balancer setup
Setting up the HA workflow
Step 1 – Set up network components
Step 2 – Enable HA on Primary server
Step 3 – Enable HA on Secondary server
Step 4 – Exchange SSH keys between servers
Step 5 – Configure and test HA sync on Secondary Ivanti EPMM server
Step 6 – Configure sync schedule and notifications
Step 7 – Test and validate the Ivanti EPMM HA environment
HA setup and configuration
High Availability Ivanti EPMM software upgrade procedures
HA command line interface (CLI) set
Documentation resources
Ivanti EPMM documentation
Docs powered by Archbee

Setting up the HA workflow

1 min

A proper Ivanti EPMM HA setup configuration consists of the following steps:

Step 1 – Set up network components

Step 1 – Set up network components

Step 2 – Enable HA on Primary server

Step 2 – Enable HA on Primary server

Step 3 – Enable HA on Secondary server

Step 3 – Enable HA on Secondary server

Step 4 – Exchange SSH keys between servers

Step 4 – Exchange SSH keys between servers

Step 5 – Configure and test HA sync on Secondary Ivanti EPMM server

Step 5 – Configure and test HA sync on Secondary Ivanti EPMM server

Step 6 – Configure sync schedule and notifications

Step 6 – Configure sync schedule and notifications

Step 7 – Test and validate the Ivanti EPMM HA environment

Step 7 – Test and validate the Ivanti EPMM HA environment

Updated 06 Oct 2026
PREVIOUS
Load balancer setup
NEXT
Step 1 – Set up network components
Docs powered by Archbee
Docs powered by Archbee

Copyright © 2026, Ivanti, Inc. All rights reserved.

Privacy and Legal